Logo

                                                                                                                                      Deutsch English

HomeServicesReferencesContact

River Engineering

Project: Hydraulic modeling of hydrometric gauging stations in canton Aargau
Client: Department of the hydrometry of canton Aargau, Aarau, Switzerland
Year: 2016

Services: Modeling of the river flow with the gauging station by means of a detailed 2D model for large discharges to verify the rating curves and to adjust them, if necessary

---------------------------------------------------------------------------------------------------

Project: Interpolation of the ADCP measurements in cross sections of a river in Canton Aargau
Client: AF-Consult Switzerland AG, Baden, Switzerland
Year: 2016

Services: Sorting and averaging the ADCP measurements with approximately 18,000 points for each cross-section and interpolating the values on a fine grid, which is fitted on the cross section

---------------------------------------------------------------------------------------------------

Project: Hydraulic study of a natural dam break upstream of an existing dam
Client: Alpiq Suisse SA, Lausanne, Switzerland
Year: 2015

Services:
2D modelling of the flood wave due to the break of the river blockage based on different Scenarios of the blockage form and the base discharge

---------------------------------------------------------------------------------------------------

Project: Investigation of the flood risk of the NPP Gösgen with considering sediment transport*
Client: Nuclear Power Plan Gösgen (KKG) , Gösgen, Switzerland
Year: 2013 - 2014 (TK Consult AG)

Services:
Fully coupled 2D simulation of extreme flood events with considering multi-grain sediment transport

---------------------------------------------------------------------------------------------------

Project: Hydrological Hazard Assessment of a new NPP in Vietnam*
Client: Ninh Thuan 1 Nuclear Power Plant, Vietnam
Year: 2014 (TK Consult AG)

Services: Review and verify the reports of the hydrological hazard assessment for a nuclear power plant in planning in Vietnam

---------------------------------------------------------------------------------------------------

Project: Investigation of the flood risks of the KKG due to dam breaks under the earthquake effect*
Client: Nuclear Power Plan Gösgen (KKG) , Gösgen, Switzerland
Year: 2012 - 2013 (AF Consult AG)

Services:
Hybrid 1D/2D-Model und simulations of different dam break scenarios

---------------------------------------------------------------------------------------------------

Project: Flood Protection Project, Kunz area/Stegbünt, Windisch, Switzerland*
Client: HIAG Immobilien AG , Zürich, Schweiz
Year: 2010 - 2013 (AF Consult AG)

Services:
Simulation , design and  control of the construction of the flood protection measures for a new residential area

---------------------------------------------------------------------------------------------------

Project: Project Gstaldenbach River/ Freibach*
Client: Canton St. Gallen, Public Works, Switzerland
Year: 2010 (AF Consult AG)

Services:
Engineering expertise regarding sediment transport of the river for the new condition with structural measures

---------------------------------------------------------------------------------------------------

Project: Flood hazard risk of a new NPP in Indonesia*
Client: Indonesian National Nuclear Energy Agency, Indonesia
Year: 2012 (AF Consult AG)

Services:
Review and expertise of flood hazard risk analysis of the selected sites

---------------------------------------------------------------------------------------------------

Project: Modeling Wave and currents of the Geneva beach*
Client: Canton Geneva, Switzerland
Year: 2007 - 2015 (EPFL, e-dric)

Services: Wave and currents calculation, Beach erosion/Beach Nourishment, Water quality inside harbors, Harbor silting, Wave force calculations by using Mike21 und SWAN

---------------------------------------------------------------------------------------------------
* The projects are finished by the team during their employment in the past companies. The name of the company is mentioned in the
    parenthesis.